QTY |
FOB PRICE |
CIF PRICE
QUANTITY
-
+
box
TOTAL COST
$1660Model : 300*3 |
Material : Default |
Pcs/Carton : N/A | Packing Size/Carton : N/A | Packing Vol/Carton : N/A |
N.W./Carton : N/A | G.W./Carton : N/A | QTY in 40HQ : N/A |
QTY in 40GP : N/A | QTY in 20GP : N/A |
Water prices in the case of water swelling manufacturers prices appear a new low [water expansion water seal construction]
1, fixed water stop concrete interface to maintain the formation of dry, clean the interface before the removal of scum dust and debris, with a nail or glue to stop the water strip fixed in the installation site has been identified. But must have the surface of the grouting pipe on the original concrete interface.
2, when the water connection is connected with a parallel lap method, the middle of which shall not be broken points, connecting the water strip with steel nails to strengthen the fixed, and the water seal on the reserved grouting pipe into another equal Stops on the two links.
3, according to the length of the installation of waterstops at about 30 meters at the installation of a three-way, three ends of the straight line at about one end into the water seal, one inserted into the grouting pipe, the other end of the word should be Insert into the spare grouting, to prepare the gap when the leakage of water injection of chemical pulp to stop using water.
4, must be connected to the grouting pipe in the grouting pipe and the three-way connector firmly bonded, must ensure that the installation of the water pipe grouting pipe completely smooth. The spare grouting pipe installed on the tee should be placed in the inner wall. The following are the same as the "
• Amanbo Return Policy applies to all orders on amanbo.com.
• If products are not as described, returns are accepted and return shipping fee should be paid by buyer.
• If products are as described, seller has the right to refuse return. Buyer should pay return shipping fee if return require is insisted on.